Leave Your Message

slide1

SCB13-500/10.5 Dry-type Power Transformer

SCB13-500/10.5 Dry-type Power Transformer

2500kVA 13.8kV Pad-Mounted Fully Sealed Transformer

Our pad-mounted transformer features stable performance, fully sealed maintenance-free design, flexible installation, and strong overload capacity, meeting various power distribution needs in harsh working sites.

  • Reliable 13.8kV to 400Y/230V step-down transformer for industrial parks, commercial centers, residential communities, data centers and mines.
  • Factory production cycle is stable. Typical delivery time is 15-20 days.
  • Fully sealed integrated design. Oil evaporation is close to zero. 20 years maintenance-free, no oil refill needed.
  • Comprehensive services available, including foundation construction, switchgear and intelligent monitoring system.

    Product Parameters

    WEIGHT LIST

    CODE & COIL

    2910 KG

    BIL

    HV 95kV/LV 30kV

    TANK

    1310 KG

    MAT

    HV AL/LV AL

    LIQUID

    1540 L

    EFFICIENCY

    99.42%

    TOTAL WEIGHT

    5610 KG

    IMP

    4.7% (at 85°C)

    TAP VOLTAGE (V)

    TAP VOLTAGE (V)

    CURRENT (A)

    TAP POS.

    14490

    99.6

    2-3

    14145

    102.0

    3-4

    13800

    104.6

    4-5

    13455

    107.3

    5-6

    13110

    110.1

    6-7

    400Y/230

    3608.5

    L V

    nameplate

    Main Advantages

    Delivery Lead Time:

    Our production schedule is stable and reliable. Standard models can be delivered within 15–20 days. Customized configurations (special voltage, stainless steel tank, FR3 natural ester oil, etc.) typically require 30–45 days.

    Oil Consumption:

    The hermetically sealed design completely isolates the insulating oil from external air. Oil evaporation is virtually zero, eliminating the hassle of periodic oil top-ups required by conventional transformers.

    Maintenance:

    "Maintenance-Free, Long Service Life, Low Investment, High Reliability" — The pad-mounted transformer features a hermetically sealed, maintenance-free structure. Throughout its 20-year design life, there is no need for oil top-ups or oil filtration. Routine maintenance requires only a biannual visual inspection of the exterior, oil level, and oil temperature.

    In the event of a fault, the Bay-O-Net fuse can be replaced on-site within 30 minutes — no specialized personnel required. Total operation and maintenance costs are only one-third of those for conventional transformers.

    Ideal for industrial parks, commercial centers, data centers, and renewable energy stations — a worry-free, cost-effective power distribution solution.

    Pricing:

    The price is 30%–40% lower than a European-style compact substation of the same capacity, and 40%–60% lower than a dry-type transformer. Copper or aluminum windings are available to optimize costs based on project requirements.

    Application Scenarios

    This three-phase 2500kVA fully sealed pad-mounted transformer is specifically designed for industrial parks, commercial centers, residential communities, data centers, mines, renewable energy stations, as well as replacement and expansion projects, achieving stable power distribution from 13800V to 400Y/230V.

    application-scenarios

    Factory Workshop

    Factory Production Capacity: 12,000 transformers per year
    Assembly Workshop Equipment: 6 cutting lines, 15 winding machines, 5 foil winding machines
    Testing Facilities: 220kV Test Hall, Transformer Testing Center
    Delivery Equipment: Fully-automatic overhead cranes

    Videos

    Pain Points & Solutions

    I.Fully Sealed American-Standard Structure for Stable and Reliable Power Distribution

     

    -- Suitable for industrial parks, commercial centers, residential communities

    -- Fully sealed integrated design; isolates moisture and salt spray; 20 years maintenance-free

    -- Dual-fuse protection; fault recovery within 30 minutes

    -- Volume is only 1/3 of European-standard type; no need for a dedicated substation building 

    -- Protection rating IP33-IP56; operates from -40°C to +45°C 

     

    II.ODM Customization for Replacement, Expansion, and New Projects

     

    --4.7% impedance; 2x overload for 2 hours

    --Customization options: voltage, installation type, standard, structure, enclosure, insulating oil, smart configuration

    --Applications: transformer replacement / capacity expansion / zone power distribution / renewable energy grid connection / temporary power supply / mining and construction

     

    III.High Cost-Performance Ratio, Low Long-Term Operation and Maintenance Costs

     

    --Price is 30-40% lower than international brands

    --Fully sealed, maintenance-free design; no oil refill needed for 20 years

    --Dual-fuse protection; transformer body is rarely damaged

    --Efficiency up to 99.42%; energy-saving

    --Optional stainless steel enclosure + FR3 oil to meet harsh environment and fire protection requirements

     

    Does your project need a reliable pad-mounted transformer?

    Our 2500kVA 13.8kV pad-mounted transformer provides stable power distribution from 13800V to 400Y/230V for power grids, factories, commercial buildings, and expansion projects.

    Customer Testimonials

    --The transformer operates smoothly on site, and the installation coordination work was efficient. We particularly appreciate the team's quick response and practical support during the commissioning period.
    Juan dela Cruz
    Philippines

    ---The transformer operates stably, and the installation process went smoothly. The technical team's quick response and on-site support during the commissioning period left us deeply impressed.
    James Wilson
    Texas, USA

    --The transformer operates smoothly under high-temperature conditions, and the installation and commissioning work was completed efficiently. Special thanks to the project team for their quick response and professional support during the commissioning period.
    Ahmed Ali
    Saudi Arabia

    --The transformer operates smoothly on site, and the installation and commissioning work was efficient. We particularly appreciate the technical team's quick response and professional support during the project.
    Carlos Mendes
    Brazil

    Related Products

    related-products-2500kva-1 related-products-2500kva-1
    related-products-2500kva-2 related-products-2500kva-2

    FAQ

    I.Pressure

    Q1: What is the internal pressure of a pad-mounted transformer? Can it explode?

    A: Pad-mounted transformers are of hermetically sealed construction. Under normal operating conditions, the internal pressure is very low (approximately 0.03–0.06 MPa). A pressure relief valve is installed on the top of the tank. If an internal fault causes a sudden pressure rise, the valve automatically opens to release pressure and then resets and re-seals after the pressure drops. Explosions will not occur. This is a standard safety feature of pad-mounted transformers.

     

    Q2: Can it explode?

    A: No. The unit is equipped with a pressure relief valve that automatically releases pressure in the event of overpressure.

    Q3: What should I do if the pressure relief valve has operated?

    A: Operation of the pressure relief valve indicates that an internal arcing fault or severe overload has occurred. Immediate investigation is required.

    Q4: How can I check if the pressure relief valve is functioning properly?

    A: Perform a visual inspection for oil leakage or signs of operation, and manually test the reset function.

    Q5: How often should the pressure relief valve be replaced?

    A: Inspect after every operation. Replacement is recommended every 10 years.

     

    II.Oil Consumption

    Q1: How can I tell if the oil has deteriorated?

    A: Perform Dissolved Gas Analysis (DGA) — oil chromatography analysis — annually to detect characteristic fault gases.

    Q2: What type of oil is used and how often should it be replaced?

    A: We use Class II mineral oil or FR3 natural ester (vegetable) oil.

    Replacement interval: Under normal use, replacement is not required for 10–15 years. Annual DGA testing is sufficient. If the oil fails testing (e.g., reduced breakdown voltage, excessive fault gas levels), oil filtration or replacement is necessary.

    Q3: Does the oil evaporate? Is periodic oil top-up required?

    A: No. The pad-mounted transformer features a hermetically sealed design, completely isolating the insulating oil from external air. Oil evaporation is virtually zero. Under normal conditions, no oil top-up is needed for 20 years. The oil level will only drop if a leak occurs, in which case the leak must be located and repaired before adding oil.

    Q4: Is there a high risk of oil leaks in pad-mounted transformers?

    A: Attention should be paid. Since the transformer tank is exposed to the outside, regular inspections should be carried out to prevent leakage caused by external mechanical damage. Selecting a stainless steel tank shell with enhanced protection can reduce the risk.

     

    III.After-Sales Service

    Q1: How long is the product warranty period? From which date does it start?

    A: The warranty period is 2 years. It commences from the date of equipment acceptance. If acceptance is delayed for customer-related reasons, the warranty is deemed to start no later than 18 months from the date of shipment.

    Q2: What after-sales service is available for overseas customers? Do you have overseas service centers?

    A: We offer two service modes: remote video guidance and on-site service. Authorized service partners are available in key markets (e.g., Southeast Asia, Middle East). For other regions, we can dispatch engineers for overseas service (costs to be negotiated separately).

    Q3: Who is responsible if the equipment is damaged during transit? How are claims handled?

    A: Our factory is responsible for handling quality issues arising during transportation and will bear the associated costs.

    Q4: How are quality issues during the warranty period handled? Is repair or replacement free of charge?

    A: For issues caused by manufacturing defects, our factory provides free-of-charge repair. We also provide lifetime service and spare parts availability.

    Q5: Can you provide installation and commissioning guidance?

    A: Yes, we can.

     

    IV.Delivery Lead Time

    Q1: How soon can you ship after an order is placed?

    A: Typically 15–20 days.

    Q2: What is the delivery time for large-volume orders?

    A: Depends on the quantity, generally 30–60 days.

    Q3: Can you expedite an order? What is the expediting fee?

    A: Yes. Urgent orders can be prioritized through production scheduling. Delivery time can be shortened to 7–10 days. The expediting fee is generally 10%–20% of the contract value, depending on the production schedule.

    Q4: What is the delivery time for customized products?

    A: Generally 30–45 days (e.g., special voltage, stainless steel tank, FR3 oil, etc.).

    Q5: What packaging standards do you use? What level of moisture and rust protection is provided? Is it suitable for long-distance ocean freight?

    A: Packaging complies with international standards. Moisture and rust protection levels reach IP33–IP56 with 20-year corrosion resistance. The hermetically sealed structure is highly suitable for long-distance ocean freight and has been successfully exported to numerous countries.

     

    V.Spare Parts

    Q1: Where can I purchase spare parts?

    A: Spare parts can be sourced directly from our factory or locally.

    Q2: What information is needed to order spare parts?

    A: Serial number, photo of the nameplate, and the spare part name/model number.

     

    VI.Other Frequently Asked Question?

    Q1: What is the service life of a pad-mounted transformer?

    A: Under normal operating conditions, the design life is 20–30 years. With its hermetically sealed, maintenance-free design, combined with regular inspections and annual DGA testing, stable operation for over 20 years is the standard expectation.

    Q2: Are 50Hz and 60Hz transformers interchangeable?

    A: Absolutely not!

    Q3: Can you provide a spare parts list with part numbers?

    A: Yes, we can.

    Q4: If spare parts are not available locally, can you ship them directly overseas?

    A: Yes, we can ship spare parts directly from our factory to your overseas location.

    Leave Your Message